Eliminate the blind spots in information collection caused by traditional manual inspections and paper-based records, and build a multidimensional early warning system
Relying on service modules such as demand management and energy consumption management in the system, flexibly connecting with the demand side electricity policies of power supply companies,
Intelligent performance includes network computing, load balancing, application services, etc., accurate calculation and analysis of energy consumption, and easy operation.
Yangming Electromechanical has its own 300 person service team on standby 24 hours and 45 minutes to arrive at the site,
job requirements for mechanical and electrical installation
in order to promote the effective development of china's power system, in the maintenance and testing of substation equipment, personnel need to carefully analyze their act…
1.before construction, check the grounding wire, 10kv testing pen, warning signs of 'no switching on, no working', insulated gloves, insulated boots, and other security equipment at…